load point造句
例句與造句
- A new method to forecast regional short - term load based on similar load point
基于負(fù)荷點(diǎn)相似的地區(qū)短期負(fù)荷預(yù)測(cè)新方法 - Tape load point
帶起始點(diǎn) - Give the seller sufficient notice of the vessel name , loading point and required delivery time
給予賣方有關(guān)船名、裝船點(diǎn)和要求交貨時(shí)間的充分通知。 - The reliability evaluation of distribution system is used for evaluating indexes of the load points and system
配電系統(tǒng)的可靠性評(píng)估主要用于估計(jì)負(fù)荷點(diǎn)和整個(gè)系統(tǒng)的可靠性指標(biāo)。 - Through studying the relation between crack lengths and loading point compliance , we get the quantificational formula
通過(guò)探索加載點(diǎn)位移曲線得到柔度與試樣裂紋長(zhǎng)度的關(guān)系,建立定量計(jì)算式。 - It's difficult to find load point in a sentence. 用load point造句挺難的
- As the result , probabilistic static security indices based on system , load point and element levels are introduced
在此基礎(chǔ)上,建立了系統(tǒng)、負(fù)荷節(jié)點(diǎn)和元件三個(gè)層次的電力系統(tǒng)概率靜態(tài)安全指標(biāo)體系。 - As the res ult , probabilistic dynamic security and integrated assessment indices based on system , load point and element levels are introduced
在此基礎(chǔ)上,建立了系統(tǒng)、負(fù)荷節(jié)點(diǎn)和元件三個(gè)層次的電力系統(tǒng)概率動(dòng)態(tài)安全和概率綜合安全指標(biāo)體系。 - The response of pavement has fast attenuation about the loading point , because of the damp . at last , this paper utilizes the analytic solution to backcalculate the foundation parameter
這一點(diǎn)對(duì)解釋道面材料的疲勞破壞、材料的松散都有著重要的意義:由于地基模型中考慮了阻尼的影響,使得彎沉在加載點(diǎn)附近的衰減加快。 - Foreign investment enterprise service center has been set up to provide streamlined services " , there are five port loading points , two container truck inspection factories , and one import container port
韶關(guān)海關(guān)、進(jìn)出口檢驗(yàn)檢疫局、質(zhì)量技術(shù)監(jiān)督局等機(jī)構(gòu)可提供各種涉外服務(wù)。全市有五個(gè)口岸裝卸點(diǎn),兩個(gè)貨柜車查驗(yàn)廠,一個(gè)進(jìn)口集裝箱港口。 - According to the characters of shimadzu electro hydraulic servo controlled fatigue testing machine and ct specimen , put forward a method based on compliance of stroke displacement which reflects the displacement of loading point at first time
本項(xiàng)研究根據(jù)島津液壓伺服材料試驗(yàn)機(jī)和ct試樣的特點(diǎn),首次提出了基于通過(guò)測(cè)量反映加載點(diǎn)位移的試驗(yàn)機(jī)活塞位移的卸載柔度法來(lái)測(cè)量裂紋長(zhǎng)度。 - Considering effects of major factors on root section stresses , 2d and 3d dynamic finite element models are accurately established and then the history of both the stresses - loads at the test - points and the deflection - loads at the loading points are evaluated
綜合分析影響齒根應(yīng)力的重要因素的基礎(chǔ)上,創(chuàng)建了精確的二維和三維動(dòng)態(tài)有限元模型,計(jì)算出齒根危險(xiǎn)截面測(cè)點(diǎn)的應(yīng)力歷程和受載點(diǎn)的變形歷程。 - Therefore , the model presented in this paper is more accurate to simulate faults of distribution network and the outage situation of load points , and reliability risk indices and reliability worth indices can be calculated according to different dispatching strategy
本文提出的模型在模擬配電網(wǎng)的故障和負(fù)荷點(diǎn)停電情況方面更加真實(shí),并可以評(píng)估不同的調(diào)度策略可靠性風(fēng)險(xiǎn)指標(biāo)和可靠性效益指標(biāo)的影響。 - The practical situations of system operations are considered in this paper . based on the enumeration of the cut sets for the load point interruption , load transition character , maintenance of devices , active failure mode and overload of transmission line are all discussed
該方法考慮了系統(tǒng)運(yùn)行的實(shí)際情況,列舉引起負(fù)荷點(diǎn)停電事件割集,還考慮了負(fù)荷點(diǎn)供電的轉(zhuǎn)移特性,網(wǎng)絡(luò)元件的計(jì)劃?rùn)z修和主動(dòng)性故障使評(píng)估過(guò)程更加合理和有效。 - ( 4 ) reliability indexes of system and load point are analyzed , such as lolp ( loss of load probability ) , flol ( frequency of loss of load ) , dlol ( duration of loss of load ) , lole ( loss of load expectation ) , edns ( expected demand not supplied ) and eens ( expected energy not supplied )
對(duì)全網(wǎng)及各負(fù)荷點(diǎn)的可靠性指標(biāo)如系統(tǒng)失負(fù)荷概率lolp 、失負(fù)荷頻率flol 、失負(fù)荷持續(xù)時(shí)間dlol 、失負(fù)荷期望lole 、電力不足期望edns 、供電量不足期望eens等進(jìn)行了計(jì)算分析。 - And the displacement control of the leaf spring center was transferred to the displacement at load point . then after the load step options configuration , the leaf spring stress circulation under cycle loadings was calculated . the model was validated by the result compare between the rigid extracted from the simulation results and the one out of the rigid test of the leaf spring
使用加載頭和簧片的接觸行為來(lái)模擬加載狀況,并將對(duì)簧片中心的變形控制轉(zhuǎn)換為對(duì)加載點(diǎn)的位移約束,然后利用載荷步選項(xiàng)配置完成一個(gè)載荷循環(huán),由此計(jì)算出加載階段下鋼板彈簧內(nèi)部的應(yīng)力循環(huán)。
更多例句: 下一頁(yè)